WEEKS 19-21

WEEKS 19-21

A SELECTION OF PICTURES FROM WEEKS 19-21 OF THE NEW BUILD PROGRAMME

  • 3G All Weather Pitch

    After levelling and filling in the back field the top corner at the back of the new block was almost 2 metres above ground level as a result a retaining wall had to be built

    IMG_1587.JPG
    3112
    3G All Weather Pitch
    After levelling and filling in the back field the top corner at the back of the new block was almost 2 metres above ground level as a result a retaining wall had to be built
  • 3G All Weather Pitch

    The retaining wall and electrical box for the floodlighting. This will allow us to train and play up until 21:00 Monday to Friday.

    IMG_1588.JPG
    3113
    3G All Weather Pitch
    The retaining wall and electrical box for the floodlighting. This will allow us to train and play up until 21:00 Monday to Friday.
  • 3G All Weather Pitch

    Installing the fence posts around the new pitch

    IMG_1600.JPG
    3114
    3G All Weather Pitch
    Installing the fence posts around the new pitch
  • 3G All Weather Pitch

    The new fence posts being installed and an inner perimeter walkway.

    IMG_1601.JPG
    3115
    3G All Weather Pitch
    The new fence posts being installed and an inner perimeter walkway.
  • Existing Pitch

    The remaining rugby pitch with landscaped field at the rear which will form another playing pitch .

    image (3).jpeg
    3116
    Existing Pitch
    The remaining rugby pitch with landscaped field at the rear which will form another playing pitch .
  • 3G All Weather Pitch

    Creating the service road and walkway to the pitch

    image (5).jpeg
    3117
    3G All Weather Pitch
    Creating the service road and walkway to the pitch
  • 3G All Weather Pitch

    Creating the service road and walkway to the pitch

    image (7).jpeg
    3118
    3G All Weather Pitch
    Creating the service road and walkway to the pitch
  • 3G All Weather Pitch

    Installing drainage into the new pitch

    image (9).jpeg
    3119
    3G All Weather Pitch
    Installing drainage into the new pitch
  • 3G All Weather Pitch

    Creating the service road and path from the school to the all weather pitch .

    image (11).jpeg
    3120
    3G All Weather Pitch
    Creating the service road and path from the school to the all weather pitch .
  • Junior Hall

    Reinforcing bar laid prior to pouring the cement floor for the junior hall - looking towards Music Department

    IMG_1489.JPG
    3121
    Junior Hall
    Reinforcing bar laid prior to pouring the cement floor for the junior hall - looking towards Music Department
  • Junior Hall

    Reinforcing bar laid prior to pouring the cement floor for the junior hall - looking towards new front entrance

    IMG_1490.JPG
    3122
    Junior Hall
    Reinforcing bar laid prior to pouring the cement floor for the junior hall - looking towards new front entrance
  • New Boiler House

    Building the new boiler house at the back of the Gymnasium which will provide heating and hot water for all the new building and the existing main block .

    IMG_1492.JPG
    3124
    New Boiler House
    Building the new boiler house at the back of the Gymnasium which will provide heating and hot water for all the new building and the existing main block .
  • Music Department

    Looking through the Music Classrooms towards Llandennis Road

    IMG_1493.JPG
    3125
    Music Department
    Looking through the Music Classrooms towards Llandennis Road
  • New Front Entrance

    Brickwork progressing well on the new front entrance wall

    IMG_1639.JPG
    3126
    New Front Entrance
    Brickwork progressing well on the new front entrance wall
  • New Front Entrance

    Brickwork progressing well on the new front entrance wall. Above the new entrance will be the Art Department .

    IMG_1641.JPG
    3127
    New Front Entrance
    Brickwork progressing well on the new front entrance wall. Above the new entrance will be the Art Department .
  • Junior Hall

    Looking from the first floor into the new junior hall towards the main entrance

    IMG_1647.JPG
    3129
    Junior Hall
    Looking from the first floor into the new junior hall towards the main entrance
  • Junior Hall

    Looking from the first floor into the new junior hall towards the music department.

    IMG_1648.JPG
    3130
    Junior Hall
    Looking from the first floor into the new junior hall towards the music department.
  • New Boiler House

    Looking at the new boiler house

    IMG_1649.JPG
    3131
    New Boiler House
    Looking at the new boiler house
  • New Classrooms

    Looking at the exterior walls of the new classrooms on Llandennis road side of the new extension.

    IMG_1652.JPG
    3132
    New Classrooms
    Looking at the exterior walls of the new classrooms on Llandennis road side of the new extension.
  • Music Department

    Rear wall of the new build music classrooms with boiler house in the distant

    IMG_1655.JPG
    3134
    Music Department
    Rear wall of the new build music classrooms with boiler house in the distant
  • Main Entrance

    Looking at the new main entrance with Art Department above

    IMG_1656.JPG
    3135
    Main Entrance
    Looking at the new main entrance with Art Department above
  • Brickwork

    The new exterior brickwork

    IMG_1657.JPG
    3136
    Brickwork
    The new exterior brickwork
  • Music Department

    Looking down onto the new music department.

    photo (9).jpg
    3137
    Music Department
    Looking down onto the new music department.