Skip to content ↓
Cardiff High School Logo

Cardiff High School

Tua'r Goleuni – Towards the Light

WEEK 22-25

WEEK 22-25

SELECTION OF PICTURES FROM WEEKS 22-25 OF THE NEW BUILD PROGRAMME

  • 3G Pitch

    Creating the entrance path from the sports hall

    1.JPG
    3180
    3G Pitch
    Creating the entrance path from the sports hall
  • Second Playing Pitch

    Sand slitting - digging deep channels into pitch and backfilling with sand to help with drainage

    2.JPG
    3181
    Second Playing Pitch
    Sand slitting - digging deep channels into pitch and backfilling with sand to help with drainage
  • 3G ATP

    carrying out final levelling before applying shock pad rubber matting

    3.JPG
    3182
    3G ATP
    carrying out final levelling before applying shock pad rubber matting
  • Second Playing Pitch

    removing large stones before laying grass seed

    4.JPG
    3183
    Second Playing Pitch
    removing large stones before laying grass seed
  • Second Playing Pitch

    Levelling off and removing stones before seeding

    5.JPG
    3184
    Second Playing Pitch
    Levelling off and removing stones before seeding
  • 3G ATP

    Applying last bits of stone and levelling off

    6.JPG
    3185
    3G ATP
    Applying last bits of stone and levelling off
  • 3G ATP

    Laying down rubberised shock pad- Large jigsaw type rubber pads around 15 mm thick

    7a.jpeg
    3187
    3G ATP
    Laying down rubberised shock pad- Large jigsaw type rubber pads around 15 mm thick
  • 3G ATP

    Laying down rubberised shock pad- Large jigsaw type rubber pads around 15 mm thick

    7b.jpeg
    3188
    3G ATP
    Laying down rubberised shock pad- Large jigsaw type rubber pads around 15 mm thick
  • 3G ATP

    First roll of playing surface - 40 mm artificial grass

    8.JPG
    3189
    3G ATP
    First roll of playing surface - 40 mm artificial grass
  • 3G ATP

    Floodlight and half pitch already covered

    9a.JPG
    3191
    3G ATP
    Floodlight and half pitch already covered
  • 3G ATP

    Rolling out the artificial grass carpet

    9b.JPG
    3192
    3G ATP
    Rolling out the artificial grass carpet
  • New Junior Hall roof

    Flat roof covering above the Art Department and new Junior Hall

    10.jpeg
    3193
    New Junior Hall roof
    Flat roof covering above the Art Department and new Junior Hall
  • Junior Hall

    Inside the junior hall looking towards the music department

    image (11).jpeg
    3194
    Junior Hall
    Inside the junior hall looking towards the music department
  • New Classrooms

    Looking through the additional general teaching classrooms of which there are to be 6 in total. Looking out of the windows to left you will see Llandennis Avenue

    image (15).jpeg
    3195
    New Classrooms
    Looking through the additional general teaching classrooms of which there are to be 6 in total. Looking out of the windows to left you will see Llandennis Avenue
  • New Junior Hall / Art Department

    Looking down onto the existing Drama Department and how it joins the new building. All the external windows of the drama department are to be replaced in the summer with double glazed units.

    IMG_1679.JPG
    3196
    New Junior Hall / Art Department
    Looking down onto the existing Drama Department and how it joins the new building. All the external windows of the drama department are to be replaced in the summer with double glazed units.
  • New Block Roof

    Laying the new roof above the new Art classroom

    IMG_1728.JPG
    3197
    New Block Roof
    Laying the new roof above the new Art classroom
  • New Block Roof

    Laying the new roof above the new Art classroom

    IMG_1729.JPG
    3198
    New Block Roof
    Laying the new roof above the new Art classroom
  • New Block Entrance

    Looking at the exterior of the front entrance and side wall . Ground floor general teaching classrooms and above the Art department

    IMG_1736.JPG
    3199
    New Block Entrance
    Looking at the exterior of the front entrance and side wall . Ground floor general teaching classrooms and above the Art department
  • New Lift

    Looking at the ground floor entrance to the new lift which will be situated in the main lobby.

    IMG_1737.JPG
    3200
    New Lift
    Looking at the ground floor entrance to the new lift which will be situated in the main lobby.
  • Junior Hall

    Looking into the new junior hall from the front entrance end towards music

    IMG_1738.JPG
    3201
    Junior Hall
    Looking into the new junior hall from the front entrance end towards music
  • Boiler House

    Looking Inside the new boiler house which will container 2 boilers and water heaters. All above ground so unlike the old boiler room won't be prone to flooding in winter!!

    IMG_1740.JPG
    3203
    Boiler House
    Looking Inside the new boiler house which will container 2 boilers and water heaters. All above ground so unlike the old boiler room won't be prone to flooding in winter!!
  • General Teaching Classrooms

    Looking at the outside of the new classrooms

    IMG_1743.JPG
    3204
    General Teaching Classrooms
    Looking at the outside of the new classrooms
  • 3G ATP

    2 of the 4 floodlights which will light up half of the new all weather training pitch

    photo (11).jpg
    3205
    3G ATP
    2 of the 4 floodlights which will light up half of the new all weather training pitch